References
BUTLER, B.S., AND VANDERWILT, J.W., 1933, THE CLIMAX MOLYBDENUM DEPOSIT, COLORADO: USGS BULL. 846-C.WALLACE, S.R., AND OTHERS, 1968, MULTIPLE INTRUSION AND MINERALIZATION AT CLIMAX, COLORADO, IN RIDGE, J.D., ED., ORE DEPOSITS OF THE UNITED STATES, 1933-1967: AIME GRATON-SALES VOLUME, V. 1, P. 605-640.VANDERWILT, AND KING, R.U., 1955, HYDROTHERMAL ALTERATION AT THE CLIMAX MOLYBDENITE DEPOSIT: MINING ENGINEERING, V. 7, NO 1, P.41-53.BURK, SNELL G, NOV 1959, NEW PLANT RECOVERS TUNGSTEN, TIN; MINING WORLD MAG., V 21, N 12, P 38-43.CLIMAX DESIGN, AUG 1955, MINING ENGINEER, V 7, P 726-779.HENDERSON, ROBERT, JUL 1955, COMMENTS ON CAVING AT CLIMAX,MINING CONGRESS J. P 45-8.JULIAN, DOUGLAS E, SEP 20, 1975, FUTURE DEVELOPMENTS IN BLOCK CAVING, SKILLINGS MINING REVIEW. P 12-15.MOLYBDENUM - THE FIRM BASE FOR AMAX DIVERSIFICATION, SEP 1972, ENG & MIN J. P 102-110.MOLY NEWS - NUMEROUS ISSUES USED FOR EVALUATION FROM 1966-MAR 1979OBERT, LEONARD, 1972, CAVING PROPERTIES OF THE CLIMAX ORE BODY, AIME INTERMTN SEC. MIN. CONFERENCE AT VAIL, CO, AUG 22, 1973, 22 PP.TECHNICAL INFORMATION OF THE CLIMAX PROPERTY. AMAX CLIMAX MOLYBDENUM COMPANY. SPRING 1974. 36PP.RYAN'S NOTES, NEWS, FEB., 13, 1995, "CLIMAX MOLY MINE TO OPEN IN APRIL".AMAX 1985 ANNUAL REPORT.AMAX 1983 ANNUAL REPORT.AMAX SEC FORM 10-K REPORTS FOR YEARS 1979-1991.DILLARD, GARY. MOTIVATION, AUTOMATION MEETING THE CHALLENGE. PAY DIRT MAG. (ROCKY MT ED.), JULY 1992, PP. 4A-6A.MC CLEAN, STEVE. CLIMAX MOLYBDENUM TO RESUME MINE PRODUCTION AT CLIMAX. PAY DIRT MAG. (ROCKY MT ED.),NOV. 1990, P. 4A.U.S. GEOLOGICAL SURVEY, 1942, TENMILE MINING DISTRICT, COLORADO: U.S. GEOLOGICAL SURVEY (UNCLASSIFIED MAP), SCALE: 1:12,000.COLO. STATE METAL MINING FUND, 1960, TUNGSTEN MINES OF COLORADO, P.20.Climax Molybdenum Co. and Phelps Dodge Corp. information accessed on the internet on May 25, 2006WALLACE, STEWART R., ET AL, 1968, MULTIPLE INTRUSIONS AND MINERALIZATION AT CLIMAX, COLORADO. ORE DEPOSITS OF THE UNITED STATES 1933-1967, AIME GRATON-SALES VOLUME (JOHN D.RIDGE, ED.) V.1, P 605-40.Wallace, S. R.,and Snow, G. G., 1989, The Porphyry Molybdenite Deposits at Climax, Colorado, in Mineral Deposits of North America;Vol 1. Mineral Deposits and Geology of Central Colorado, B. Bryant and D. Beaty Eds.: Am. Geophys Union, p. T 128 38-44White, W.H.,Bookstrom, A.A., Kamilli, R.J., Ganster, M.W., Smith, R.P., Ranta, D.E., and Steininger, R.C., 1981, Character and Orgin of Climax-type Molybdenum Deposits: in Economic geology; Seventy-fifth anniversary volume; 1905-1980, pgs 270-316BORN, C. A., ET. AL., 1976, MOLYBENITE FLOTATION REAGENT DEVELOPMENT AT CLIMAX, COLORADO. FLOTATION. AIME A. M.GAUDIN MEMORIAL VOLUME.(M.C. FUERSTENAU, ED.) V.2 PP. 1147-1183.AMAX SEC FORM 10-K REPORT, DEC 31, 1992. P. 18.COLORADO DIV. MINES ANNUAL OPERATOR REPORTS 1924-1980 (EXCEPT 1965) FOR TONS ORE (1924-1939, 1944-1964, 1966-1968, 1977-1978), TONS CONCENTRATE (1924-1926, 1930, 1933-1939), % MOS2 IN CONCENTRATE (1924, 1926, 1928, 1930-1933, 1936-1939), % MOS2 IN ORE (1927-1928, 1930-1933, 1938-1939, 1944-1950), LB MO (1953-1964, 1966-1980), LB WO3 (1953-1964, 1966-1980), % WO3 (1948-1950), LB SN (1953-1964, 1966-1980), % SN (1949-1950), TONS PYRITE CONCENTRATE (1953-1964, 1966-1980), LB MONAZITE CONCENTRATE (1953, 1966-1969). LB MO FOR 1918-1930 FROM BUTLER AND VANDERWILT (1933); LB MO FOR 1931-1945 FROM VANDERWILT (1947). ORE TONNAGE FOR 1940-1943 AND 1965 FROM CLIMAX MOLYBDENUM CO. (TERRY FITZSIMMONS, PERS. COMM., 8/82).BROWN, CALVIN C, ET AL, OCT 1968, OPEN PIT MINING AND MAINTENANCE AT THE CLIMAX MINE. MIN. CONGRESS J. PP 21-6.CHERRIER, T. E., APR 1972, OPEN PIT PLANNING AT CLIMAX MINE,COLORADO. AIME TRANS. V. 81, PP. A57-A61.EISENACH, E. J. & JAMES J. LUDWIG. FEB 1963. UNDERGROUND MINING PROGRESS. MIN. CONGRESS J. PP. 71-75.NEW 600 PRODUCTION LEVEL AT CLIMAX MINE. MAR 3, 1973, SKILLINGS MINING REVIEW, V 62, N 9. PP 1 & 11