References
ENGINEERING AND MINING JOURNAL, U.S. STEEL'S ATLANTIC CITYORE MINE FIRST TACONITE PRODUCER IN THE WEST, VOL. 166,NO. 3, MARCH 1965, PP. 73-92.----, PELLET QUALITY - LOWER COSTS: KEYNOTE DULUTH IRON MIN-ING SYMPOSIUM VOL. 167, NO. 3, MARCH 1966, PP. 94-97.LOWE, N.T., JUNE 1981, BUENA VISTA MINE: U.S. BU MINES, MASPROPERTY EVALUATION FILE REPORT.MULAR, A.L., 1978, MINERAL PROCESSING EQUIPMENT COSTS ANDPRELIMINARY CAPITAL COST ESTIMATIONS: THE CANADIAN INSTI-TUTE OF MINING AND METALLURGY, SPECIAL VOLUME 18.NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, MONTHLYNORMALS OF TEMP., PRECIP., AND HEAT, AND COOL. DEGREE DAY1941-1970, CLIMATOGRAPHY OF THE U.S. NO.81 (BY STATE),MONTANA-ENNIS AND VIRGINIA CITY, AUGUST 1973.O'HARA, T.A., QUICK GUIDES TO THE EVALUATION OF OREBODIES,CANADIAN MINING AND MET. BULLETIN, FEB. 1980.STRAM ENGINEERS, INC., 1979, CAPITAL AND OPERATING COSTESTIMATING SYSTEM HANDBOOK; U.S. BUMINES, CONTRACT NO.J0255026.SWEENEY, T.M., MARCH 1981, CARTER CREEK IRON DEPOSIT: U.S.BUMINES, MAS PROPERY EVALUATION FILE REPORT.U.S. BUMINES, 1971, PROCESS EVALUATION: COST ANALYSIS SEMI-NAR, PROCESS EVALUATION GROUP, MORGANTOWN, WEST VIRGINIA.U.S. FOREST SERVICE, MARCH 1969, BLACK BUTTE GROUP MININGCLAIMS, BEAVERHEAD NATIONAL FOREST: U.S. STEEL CORP,REPORT ON MINING CLAIMS M5452 AND M5453.----, NOV. 1976, BLACK BUTTE IRON MINE PROJECT (PROPOSED)BEAVERHEAD NAT. FOR.: U.S. STEEL CORP., REPORT ON MININGU.S. STEEL CORP., BLACK BUTTE IRON ORE DEPOSIT, MADISON CO.,MONTANA, MARCH 17, 1982.WIER, K. L. 1965, PRELIMINARY GEOLOGIC MAP OF THE BLACKBUTTE IRON DEPOSIT, MADISON CO., MONTANA: USGS OPEN-FILEWORLD MINING, REAR DUMP TRUCKS, JULY 1980, PP. 38-39.ECONOMIC GEOLOGY, 1973, V. 68, NO. 7, P. 953.MAT 1, COL 1, QUANTITY AND GRADE SUPPLIED BY U.S. STEEL;MAT 9, COL 4, QUANTITY AND GRADE SUPPLIED BY U.S. STEEL,