References
WESTERN MINER, ANALYTICAL CONTROL; MAY, 1975, P.9-16.B.C. DEPT. OF MINES AND PET. RES., G.E.M., 1973, P.23,67-69.ENG. AND MIN. JOUR., SEPT., 1973, P.108-114.COBBAN, GILLIAN, COMMINCO MOVES AHEAD ON BIG TRAIL PROJECT:NORTHERN MINER, NOV. 29, 1979, P.D31.ANALYTICAL CONTROL AND INSTRUMENTATION AT THE SULLIVAN CON-CENTRATOR, MAY 1975, WESTERN MINER, PP. 9-16.CAMPBELL, F.A., ETHIER, V.G., AND KROUSE, H.R., 1980, THEMASSIVE SULFIDE ZONE: SULLIVAN ORE BODY, ECONOMICGEOLOGY, VOL. 75, PP. 916-926.COMINCO IN THE 80'S, APRIL 11, 1980, MINING JOURNAL, P. 291.COMINCO LIMITED, 1972-79, ANNUAL REPORTS.COMINCO, RECORD SALES, MAY 9, 1980, MINING JOURNAL, P. 394.ETHIER, V.G., CAMPBELL, F.A., BOTH, R.A., AND KROUSE, H.R.,1976, GEOLOGICAL SETTING OF THE SULLIVAN OREBODY AND ES-TIMATES OR TEMPERATURES AND PRESSURES OF METAMORPHISM,ECONOMIC GEOLOGY, VOL. 71, PP. 1570-1588.FREEZE, A.C., 1966, ON THE ORIGIN OF THE SULLIVAN OREBODY,KIMBERLEY, B.C., TECTONIC HISTORY AND MINERAL DEPOSITS OFTHE WESTERN CORDILLERA, SPECIAL VOLUME NO. 8, PP. 263-294HOY, TRYGVE, OCTOBER 24, 1980, STRATIGRAPHIC AND STRUCTURALSETTING OF STRATABOUND LEAD-ZINC DEPOSITS IN SOUTHEASTERNB.C., PRESENTED AT THE 5TH ANNUAL CIM DISTRICT 6 MEETING,INTERNATIONAL GEOLOGICAL CONGRESS, 1972, GUIDEBOOK, FIELDEXCURSION A24-C24, 24TH SESSION, CANADA, PP. 26-36.MINERAL POLICY SECTOR, DEPARTMENT OF ENERGY, MINES AND RE-SOURCES, 1973, SULLIVAN, OTTAWA, CANADA.SPATE OF NEW MINES, OCTOBER 10, 1980, MINING JOURNAL, P. 286THE SULLIVAN: HEAD OF COMINCO'S MINING EMPIRE, SEPT., 1973,ENGINEERING AND MINING JOURNAL, PP. 108-114.WHITE, LANE AND JACKSON, DANIEL, JR., SEPT. 1973, COMINCO:MODERN, RESOURCEFUL, SUCCESSFUL; ENGINEERING AND MININGJOURNAL, PP. 71-86.JACOBI, H.P., COMINCO LTD.- SULLIVAN CONCENTRATOR; D.E.PICKETT, ED., IN MILLING PRACTICE IN CANADA, CIM SPECIALVOLUME 16, 1978, P.208-214.COMINCO LTD. STAFF, SULLIVAN CONCENTRATOR- KIMBERLEY, B.C.;IN MINERAL INDUSTRIES IN WESTERN CANADA, THE TENTHCOMMONWEALTH MINING AND METALLURGICAL CONGRESS-SEPT.2-28,1974, SECTION VI, ARTICLE E, P.1-13.*CRU QUARTERLY MARKET SERVICE, LEAD, JAN. 1994, P. 34.AME MINERAL ECONOMICS QUARTERLY MINE ANALYSIS, JUNE 1993,P. 38.P. 38, 43.1995 COMINCO ANNUAL REPORT-PG 37.-ALSO ADIT.FISH, RICHARD, SULLIVAN MINE GOES TRACKLESS; CANADIAN MININGJOURNAL, JUNE, 1978, P.38,39.REYNOLDS, J.W., PNEUMATIC BACKFILLING WITH CRUSHED ROCK ATTHE SULLIVAN MINE; CIM BULL., JULY, 1972, P.31-36.COMINCO LTD. STAFF, SULLIVAN MINE- KIMBERLEY, B.C., INMINERAL INDUSTRIES IN WESTERN CANADA, THE TENTH COMMON-WEALTH MINING AND METALLURGICAL CONGRESS- SEPT. 2-28,1974, SECTION VI, ARTICLE D, P.1-16.